{"id":38892,"date":"2026-09-17T12:19:22","date_gmt":"2026-09-17T05:19:22","guid":{"rendered":"https:\/\/vmts.ch\/?p=38892"},"modified":"2026-09-17T12:19:22","modified_gmt":"2026-09-17T05:19:22","slug":"scan-to-bim-facility-management","status":"publish","type":"post","link":"https:\/\/vmts.ch\/en\/scan-to-bim-facility-management\/","title":{"rendered":"Scan-to-BIM for Facility Management"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\" style=\"font-size:18px;line-height:1.6;color:#1A1A1A\">Facility managers depend on accurate as-built data more than anyone else in a building&#8217;s lifecycle, yet they typically inherit the least reliable documentation. Scan-to-BIM converts a laser scan of the building as it exists today into an FM-ready model with structured COBie asset data, so maintenance teams work from reality instead of outdated drawings.<\/p>\n\n\n\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_87_1 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title ez-toc-toggle\" style=\"cursor:pointer\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 eztoc-toggle-hide-by-default' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/vmts.ch\/en\/scan-to-bim-facility-management\/#Why_Facility_Management_Needs_Accurate_As-Built_BIM_Models\" >Why Facility Management Needs Accurate As-Built BIM Models<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/vmts.ch\/en\/scan-to-bim-facility-management\/#Common_Problems_Without_As-Built_Documentation\" >Common Problems Without As-Built Documentation<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/vmts.ch\/en\/scan-to-bim-facility-management\/#How_VMTS_Delivers_FM-Ready_BIM_Models\" >How VMTS Delivers FM-Ready BIM Models<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/vmts.ch\/en\/scan-to-bim-facility-management\/#IFC_and_COBie_Deliverables_for_FM_Workflows\" >IFC and COBie Deliverables for FM Workflows<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/vmts.ch\/en\/scan-to-bim-facility-management\/#ROI_Reducing_Maintenance_Cost_With_Accurate_BIM\" >ROI: Reducing Maintenance Cost With Accurate BIM<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/vmts.ch\/en\/scan-to-bim-facility-management\/#Case_Study_Digital_Twin_for_Facility_Maintenance\" >Case Study: Digital Twin for Facility Maintenance<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/vmts.ch\/en\/scan-to-bim-facility-management\/#Frequently_Asked_Questions\" >Frequently Asked Questions<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/vmts.ch\/en\/scan-to-bim-facility-management\/#Need_an_FM-ready_as-built_model_of_your_facility\" >Need an FM-ready as-built model of your facility?<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Why_Facility_Management_Needs_Accurate_As-Built_BIM_Models\"><\/span>Why Facility Management Needs Accurate As-Built BIM Models<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Design and construction drawings describe what a building was intended to be. What actually gets built rarely matches those drawings exactly: walls shift during construction, MEP routes get rerouted around clashes, and renovations over the years are documented inconsistently, if at all. Facility managers work against that gap every day: locating a valve, planning a retrofit, responding to a leak, or estimating a renovation all depend on knowing the real geometry and real asset data of the building, not the design-phase assumption.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">An as-built BIM model, captured from a laser scan of the building as it exists today, closes that gap once, at a known level of accuracy, instead of forcing every future maintenance task to rediscover it from scratch.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Common_Problems_Without_As-Built_Documentation\"><\/span>Common Problems Without As-Built Documentation<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-e748d6c5 wp-block-columns-is-layout-flex\">\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"border:0.5px solid #DADADA;padding:20px 22px\">\n\n<p class=\"wp-block-paragraph\" style=\"font-size:11px;font-style:normal;font-weight:700;letter-spacing:0.10em;text-transform:uppercase;color:#C70100\">Without accurate as-built data<\/p>\n\n\n<ul style=\"list-style:none;padding:0;margin:0;font-family:Arial,Helvetica,sans-serif\">\n  <li style=\"display:flex;gap:10px;margin-bottom:10px;font-size:13px;color:#4A4A4A;line-height:1.5\"><span style=\"color:#C70100;font-weight:700;flex-shrink:0\">&bull;<\/span>Crews spend time on-site just locating equipment before any work starts<\/li>\n  <li style=\"display:flex;gap:10px;margin-bottom:10px;font-size:13px;color:#4A4A4A;line-height:1.5\"><span style=\"color:#C70100;font-weight:700;flex-shrink:0\">&bull;<\/span>Retrofit planning starts from outdated drawings, so estimates carry hidden risk<\/li>\n  <li style=\"display:flex;gap:10px;font-size:13px;color:#4A4A4A;line-height:1.5\"><span style=\"color:#C70100;font-weight:700;flex-shrink:0\">&bull;<\/span>Asset data lives in spreadsheets or institutional memory, not a queryable model<\/li>\n<\/ul>\n\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"border:0.5px solid #DADADA;padding:20px 22px\">\n\n<p class=\"wp-block-paragraph\" style=\"font-size:11px;font-style:normal;font-weight:700;letter-spacing:0.10em;text-transform:uppercase;color:#1D9E75\">With an FM-ready BIM model<\/p>\n\n\n<ul style=\"list-style:none;padding:0;margin:0;font-family:Arial,Helvetica,sans-serif\">\n  <li style=\"display:flex;gap:10px;margin-bottom:10px;font-size:13px;color:#4A4A4A;line-height:1.5\"><span style=\"color:#1D9E75;font-weight:700;flex-shrink:0\">\u2713<\/span>Equipment location and access are checked before a crew is dispatched<\/li>\n  <li style=\"display:flex;gap:10px;margin-bottom:10px;font-size:13px;color:#4A4A4A;line-height:1.5\"><span style=\"color:#1D9E75;font-weight:700;flex-shrink:0\">\u2713<\/span>Retrofit scope is planned against real geometry, reducing surprises<\/li>\n  <li style=\"display:flex;gap:10px;font-size:13px;color:#4A4A4A;line-height:1.5\"><span style=\"color:#1D9E75;font-weight:700;flex-shrink:0\">\u2713<\/span>Asset data is structured and ready to feed a CMMS or CAFM system<\/li>\n<\/ul>\n\n<\/div>\n\n\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"How_VMTS_Delivers_FM-Ready_BIM_Models\"><\/span>How VMTS Delivers FM-Ready BIM Models<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>VMTS (VMT Solutions Co., LTD)<\/strong>, based in Ho Chi Minh City and serving facility teams across the DACH region and beyond, builds FM-ready models the same way any accurate Scan-to-BIM project starts: a terrestrial laser scan of the building, registered into a single point cloud, modeled natively to the agreed Level of Detail. What makes a model specifically usable for facility management is what happens after the geometry is in place: the asset data that maintenance teams actually query day to day.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Native BIM geometry<\/strong> modeled from the point cloud in Revit, Archicad, Allplan, or Vectorworks, to the LOD your FM workflow needs (see our <a href=\"https:\/\/vmts.ch\/en\/level-of-detail-lod-point-cloud-to-bim\/\">LOD matrix<\/a> for what&#8217;s realistic per component group)<\/li>\n<li><strong>Structured asset data<\/strong> attached to modeled elements: equipment type, manufacturer, model number, and other parameters your CMMS\/CAFM system needs, where the source data is available<\/li>\n<li><strong>Space and zone data<\/strong> for area management, occupancy planning, and space-related reporting<\/li>\n<li><strong>A documented QC pass<\/strong> against the source point cloud, so the model&#8217;s accuracy is verifiable, not just assumed<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">You scan, we support all downstream services, from point clouds to native BIM models.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"IFC_and_COBie_Deliverables_for_FM_Workflows\"><\/span>IFC and COBie Deliverables for FM Workflows<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Most CMMS and CAFM platforms don&#8217;t read native Revit, Archicad, or Allplan files directly; they consume open, structured formats (see our <a href=\"https:\/\/vmts.ch\/en\/ifc-cobie-iso19650-scan-to-bim-deliverables\/\">IFC, COBie, and ISO 19650<\/a> guide for how these formats differ). VMTS delivers the native BIM file for ongoing editing and coordination, alongside <strong>IFC<\/strong> and <strong>COBie<\/strong> exports on request, so the model can be handed off to whatever FM software your team runs, without being locked into a single authoring platform.<\/p>\n\n\n\n<div class=\"wp-block-group has-background\" style=\"background-color:#F5F5F5;border-left:3px solid #C70100;padding-top:20px;padding-right:24px;padding-bottom:20px;padding-left:24px\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"wp-block-paragraph\" style=\"font-size:10px;font-style:normal;font-weight:700;letter-spacing:0.12em;text-transform:uppercase;color:#C70100\">Why this matters<\/p>\n\n\n<p class=\"wp-block-paragraph\" style=\"color:#4A4A4A\">COBie (Construction Operations Building Information Exchange) packages non-graphical asset data, equipment, spaces, attributes, into a format built for handover to FM systems. A model without it is often geometry-only: useful for visualization, but not directly queryable by a CMMS without manual re-entry of the same data.<\/p>\n\n<\/div><\/div>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"ROI_Reducing_Maintenance_Cost_With_Accurate_BIM\"><\/span>ROI: Reducing Maintenance Cost With Accurate BIM<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The clearest independent evidence for the cost of poor as-built data comes from a 2004 U.S. National Institute of Standards and Technology (NIST) study, still widely cited in the AEC\/FM industry today. It estimated the capital facilities industry lost <strong>$15.8 billion annually<\/strong> to inadequate interoperability, incompatible or missing data between project phases, and found that building <strong>owners and operators absorbed $10.6 billion of that total<\/strong>, concentrated in the operations and maintenance phase. That study is two decades old, but the underlying dynamic hasn&#8217;t changed: the operations and maintenance phase is where poor documentation costs the most, because it&#8217;s the longest phase of a building&#8217;s life. An accurate, structured as-built model doesn&#8217;t eliminate that cost, but it addresses it directly, by giving FM teams a single, verified source of truth instead of forcing them to rediscover the building&#8217;s real condition on every work order.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Case_Study_Digital_Twin_for_Facility_Maintenance\"><\/span>Case Study: Digital Twin for Facility Maintenance<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/vmts.ch\/wp-content\/uploads\/2025\/09\/Staatsbibliothek_Berlin_3DModell_innen1-1024x576.jpg\" data-orig-src=\"https:\/\/vmts.ch\/wp-content\/uploads\/2025\/09\/Staatsbibliothek_Berlin_3DModell_innen1-1024x576.jpg\" alt=\"Interior BIM model of the Staatsbibliothek zu Berlin showing structural ceiling detail and multi-level floor plates\" class=\"lazyload wp-image-32282\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%271024%27%20height%3D%27576%27%20viewBox%3D%270%200%201024%20576%27%3E%3Crect%20width%3D%271024%27%20height%3D%27576%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-srcset=\"https:\/\/vmts.ch\/wp-content\/uploads\/2025\/09\/Staatsbibliothek_Berlin_3DModell_innen1-200x113.jpg 200w, https:\/\/vmts.ch\/wp-content\/uploads\/2025\/09\/Staatsbibliothek_Berlin_3DModell_innen1-300x169.jpg 300w, https:\/\/vmts.ch\/wp-content\/uploads\/2025\/09\/Staatsbibliothek_Berlin_3DModell_innen1-400x225.jpg 400w, https:\/\/vmts.ch\/wp-content\/uploads\/2025\/09\/Staatsbibliothek_Berlin_3DModell_innen1-600x338.jpg 600w, https:\/\/vmts.ch\/wp-content\/uploads\/2025\/09\/Staatsbibliothek_Berlin_3DModell_innen1-768x432.jpg 768w, https:\/\/vmts.ch\/wp-content\/uploads\/2025\/09\/Staatsbibliothek_Berlin_3DModell_innen1-800x450.jpg 800w, https:\/\/vmts.ch\/wp-content\/uploads\/2025\/09\/Staatsbibliothek_Berlin_3DModell_innen1-1024x576.jpg 1024w, https:\/\/vmts.ch\/wp-content\/uploads\/2025\/09\/Staatsbibliothek_Berlin_3DModell_innen1-1200x675.jpg 1200w, https:\/\/vmts.ch\/wp-content\/uploads\/2025\/09\/Staatsbibliothek_Berlin_3DModell_innen1-1536x864.jpg 1536w\" data-sizes=\"auto\" data-orig-sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Native BIM model of the Staatsbibliothek zu Berlin interior, delivered at LOD 300 for facility management use.<\/figcaption><\/figure>\n\n\n\n\n\n<div style=\"background:#000000;padding:36px;margin:0 0 24px;border-left:4px solid #C70100;font-family:Arial,Helvetica,sans-serif\">\n  <p style=\"font-size:10px;font-weight:700;letter-spacing:0.16em;text-transform:uppercase;color:#C70100;margin:0 0 10px\">Project Reference: VMTS<\/p>\n  <p style=\"font-size:20px;color:#ffffff;margin:0 0 24px;line-height:1.25;font-weight:700\">Staatsbibliothek zu Berlin, Germany<br><span style=\"font-size:14px;font-weight:400;color:#9E9E9E\">Scan-to-BIM for facility documentation, with bgis Kreative Ingenieure GmbH, 2025<\/span><\/p>\n  <div style=\"display:flex;gap:40px;margin-bottom:24px;flex-wrap:wrap\">\n    <div><div style=\"font-size:32px;font-weight:700;color:#ffffff;line-height:1\">170,000 m\u00b2<\/div><div style=\"font-size:11px;color:#9E9E9E;margin-top:4px;text-transform:uppercase;letter-spacing:0.08em\">building area scanned<\/div><\/div>\n    <div><div style=\"font-size:32px;font-weight:700;color:#ffffff;line-height:1\">LOD 300<\/div><div style=\"font-size:11px;color:#9E9E9E;margin-top:4px;text-transform:uppercase;letter-spacing:0.08em\">delivered accuracy<\/div><\/div>\n    <div><div style=\"font-size:32px;font-weight:700;color:#ffffff;line-height:1\">2025<\/div><div style=\"font-size:11px;color:#9E9E9E;margin-top:4px;text-transform:uppercase;letter-spacing:0.08em\">project year<\/div><\/div>\n  <\/div>\n  <p style=\"font-size:14px;color:#aaaaaa;line-height:1.7;margin:0\">VMTS delivered a precise LOD 300 BIM model of the entire 170,000 m\u00b2 Staatsbibliothek zu Berlin, working with bgis Kreative Ingenieure GmbH, giving the facility team a single, verified as-built reference for a building of this scale instead of fragmented legacy drawings.<\/p>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Read the full case study: <a href=\"https:\/\/vmts.ch\/en\/state-library-berlin-scan-to-bim\/\">State Library Berlin Scan to BIM<\/a>.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote has-background is-layout-flow wp-block-quote-is-layout-flow\" style=\"background-color:#C70100;color:#ffffff;padding:22px 36px;border:none\">\n<p style=\"color:#ffffff;font-size:16px;font-weight:700;font-style:normal;margin:0;line-height:1.45\">&#8220;An FM-ready model is not just geometry: it&#8217;s geometry your maintenance team can actually query, on day one.&#8221;<\/p>\n<\/blockquote>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Frequently_Asked_Questions\"><\/span>Frequently Asked Questions<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>What LOD is needed for a facility management BIM model?<\/summary>\n\n<p class=\"wp-block-paragraph\">LOD 300 is the practical standard for most FM use cases: accurate enough for space planning, maintenance access, and renovation scoping. LOD 400 is only needed where fabrication-level detail matters, such as complex MEP coordination.<\/p>\n\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Does an FM-ready BIM model need to include COBie data?<\/summary>\n\n<p class=\"wp-block-paragraph\">Not always, but it&#8217;s strongly recommended if the model will feed a CMMS or CAFM system. Without a structured export like COBie, asset data typically has to be re-entered manually, which defeats much of the purpose of having a digital model.<\/p>\n\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>Can Scan-to-BIM be used for an existing building with no current drawings?<\/summary>\n\n<p class=\"wp-block-paragraph\">Yes, this is one of the most common reasons facility owners commission Scan-to-BIM. A laser scan captures the building as it exists today, independent of whether original design drawings exist, are accurate, or have been lost.<\/p>\n\n<\/details>\n\n\n\n<details class=\"wp-block-details is-layout-flow wp-block-details-is-layout-flow\"><summary>What file formats does VMTS deliver for FM use?<\/summary>\n\n<p class=\"wp-block-paragraph\">The native BIM file (Revit, Archicad, Allplan, or Vectorworks) is always included. IFC and COBie exports are available on request, so the model can be used in whatever CMMS\/CAFM platform your facility team runs.<\/p>\n\n<\/details>\n\n\n\n<div class=\"wp-block-group has-background\" style=\"background-color:#000000;padding:48px;margin-top:48px\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"wp-block-paragraph\" style=\"font-size:10px;font-style:normal;font-weight:700;letter-spacing:0.16em;text-transform:uppercase;color:#C70100\">Work with VMTS<\/p>\n\n\n<h2 class=\"wp-block-heading\" style=\"color:#ffffff;font-size:24px;font-weight:400;line-height:1.3;border:none\"><span class=\"ez-toc-section\" id=\"Need_an_FM-ready_as-built_model_of_your_facility\"><\/span>Need an FM-ready as-built model of your facility?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n<p class=\"wp-block-paragraph\" style=\"color:#888888;font-size:14px\">Describe your building and FM system, and we respond within one business day with an initial assessment.<\/p>\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button\"><a class=\"fusion-button button-flat button-large button-custom fusion-button-default fusion-button-default-span fusion-button-default-type\" style=\"--button_accent_color:var(--awb-color1);--button_accent_hover_color:var(--awb-color1);--button_border_hover_color:var(--awb-color1);--button_gradient_top_color:var(--awb-custom_color_1);--button_gradient_bottom_color:var(--awb-custom_color_1);--button_gradient_top_color_hover:hsla(var(--awb-custom_color_1-h),var(--awb-custom_color_1-s),calc(var(--awb-custom_color_1-l) - 12%),var(--awb-custom_color_1-a));--button_gradient_bottom_color_hover:hsla(var(--awb-custom_color_1-h),var(--awb-custom_color_1-s),calc(var(--awb-custom_color_1-l) - 12%),var(--awb-custom_color_1-a));--button_text_transform:uppercase;\" target=\"_self\" data-hover=\"icon_slide\" href=\"https:\/\/vmts.ch\/en\/contact-us\/\"><span class=\"fusion-button-text awb-button__text awb-button__text--default\">Request assessment<\/span><i class=\"fa-long-arrow-alt-right fas awb-button__icon awb-button__icon--default button-icon-right\" aria-hidden=\"true\"><\/i><\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n\n<script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"What LOD is needed for a facility management BIM model?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"LOD 300 is the practical standard for most FM use cases: accurate enough for space planning, maintenance access, and renovation scoping. LOD 400 is only needed where fabrication-level detail matters, such as complex MEP coordination.\"}},{\"@type\":\"Question\",\"name\":\"Does an FM-ready BIM model need to include COBie data?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Not always, but it's strongly recommended if the model will feed a CMMS or CAFM system. Without a structured export like COBie, asset data typically has to be re-entered manually, which defeats much of the purpose of having a digital model.\"}},{\"@type\":\"Question\",\"name\":\"Can Scan-to-BIM be used for an existing building with no current drawings?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Yes, this is one of the most common reasons facility owners commission Scan-to-BIM. A laser scan captures the building as it exists today, independent of whether original design drawings exist, are accurate, or have been lost.\"}},{\"@type\":\"Question\",\"name\":\"What file formats does VMTS deliver for FM use?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The native BIM file (Revit, Archicad, Allplan, or Vectorworks) is always included. IFC and COBie exports are available on request, so the model can be used in whatever CMMS\/CAFM platform your facility team runs.\"}}]}<\/script>\n\n","protected":false},"excerpt":{"rendered":"<p>Facility managers depend on accurate as-built data more than anyone else in a building&#8217;s lifecycle, yet they typically inherit the least reliable documentation. Scan-to-BIM converts a laser scan of the building as it exists today [&#8230;]<\/p>\n","protected":false},"author":2,"featured_media":32263,"comment_status":"closed","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[81],"tags":[],"cs_building_type":[],"cs_software":[],"cs_lod":[],"class_list":["post-38892","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-punktwolke-zu-bim"],"acf":[],"_links":{"self":[{"href":"https:\/\/vmts.ch\/en\/wp-json\/wp\/v2\/posts\/38892","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vmts.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vmts.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vmts.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/vmts.ch\/en\/wp-json\/wp\/v2\/comments?post=38892"}],"version-history":[{"count":5,"href":"https:\/\/vmts.ch\/en\/wp-json\/wp\/v2\/posts\/38892\/revisions"}],"predecessor-version":[{"id":39292,"href":"https:\/\/vmts.ch\/en\/wp-json\/wp\/v2\/posts\/38892\/revisions\/39292"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vmts.ch\/en\/wp-json\/wp\/v2\/media\/32263"}],"wp:attachment":[{"href":"https:\/\/vmts.ch\/en\/wp-json\/wp\/v2\/media?parent=38892"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vmts.ch\/en\/wp-json\/wp\/v2\/categories?post=38892"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vmts.ch\/en\/wp-json\/wp\/v2\/tags?post=38892"},{"taxonomy":"cs_building_type","embeddable":true,"href":"https:\/\/vmts.ch\/en\/wp-json\/wp\/v2\/cs_building_type?post=38892"},{"taxonomy":"cs_software","embeddable":true,"href":"https:\/\/vmts.ch\/en\/wp-json\/wp\/v2\/cs_software?post=38892"},{"taxonomy":"cs_lod","embeddable":true,"href":"https:\/\/vmts.ch\/en\/wp-json\/wp\/v2\/cs_lod?post=38892"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}